Basis, source, vintage
Improving on cost and deteriorating on connection. Generation is cheaper and getting cheaper; grid connection for large new loads is the measurable bottleneck, and Europe's industrial price premium is structural rather than cyclical.
Source: IEA Energy and AI (E-009, E-010); Bruegel and IEA Electricity 2026 on EU industrial prices (E-090) (2025–2026)
What it is
What a unit of energy costs where the work has to happen, and whether it can be connected at all. Price and grid access are one enabler in practice: cheap power you cannot connect to is not cheap power.
What it does
It sets the gradient on everything physical, and increasingly on everything computational. It is also the enabler where the constraint has quietly moved: for large loads the binding factor in several markets is no longer generation cost but interconnection queue length. That distinction matters because the two have completely different fixes and only one of them is a technology.
Common misconception
That data centres are the driver of demand growth. They are large and they are not civilisational — roughly 1.5% of global electricity in 2024, heading to about 3% by 2030, and only around 8% of demand growth to 2030, less than electric vehicles or air conditioning. Electrification is the bigger driver, and saying so is not a defence of data centres. It is what the numbers show.
Steepens
- Digital Sovereignty — large
- Distributed and Reshored Manufacturing — large
- Energy Transition and Electrification — large
- Automation of Cognitive Work — moderate
- Circular Economy and Materials Substitution — moderate
- Hyper-automation of Industrial Production — moderate
- Water Security — moderate
What would change its gradient
- Interconnection queue reform — the single highest-leverage and least photogenic intervention available
- Storage and demand flexibility that let a load follow generation rather than requiring firm capacity
- Efficiency at the point of use, which has repeatedly resolved bottlenecks that were forecast as permanent
Shares megatrends with
- Capital Availability
- Automation
- Cloud & Datacentre Infrastructure
- Construction Technology
- Managerial Capability
- Materials Science
In the book
Why the Future Arrives Unevenly — Ch. 8 — The Rebuild of the Physical Base · Ch. 10 — The Redistribution of Power · Ch. 17 — Governments Running on Old Code · Ch. 21 — Designing for Selfishness
Sources
- Improving on cost and deteriorating on connection. Generation is cheaper and getting cheaper; grid connection for large new loads is the measurable bottleneck, and Europe's industrial price premium is structural rather than cyclical. Source: IEA Energy and AI (E-009, E-010); Bruegel and IEA Electricity 2026 on EU industrial prices (E-090) (2025–2026).
- Energy and AI — International Energy Agency, 2025