Small Modular Reactor
Readiness
TRL 7 · SRL 4.5 · gap +2.5
Gap = technical readiness − societal readiness. Positive: the technology is ready and society is not. Negative: society wants it more than the technology can deliver.
Not scored. Watchlist entries do not enter any gradient.
A small modular reactor is a nuclear reactor built small enough to be manufactured in a factory and shipped, rather than constructed on site — the same physics as a conventional plant in a different industrial format, with passive safety systems that shut it down without human intervention.
The argument for it is not primarily safety or waste. It is the construction cost overruns that have made large nuclear projects difficult to finance in Western markets, and the claim that serial factory production would do to reactors what it did to aircraft.
Technical readiness is 7 and societal readiness 4.5, but the honest constraint is neither. The serial-production argument requires a large order book to be true, and the order book requires the cost argument to be proven first. That is a chicken-and-egg problem in capital formation — the same shape as the constraint Chapter 8 finds in European AI.
Common misconception: that the design is the hard part. Designs exist and several are licensed. The hard part is being the customer for the tenth one, when only the tenth one is cheap.
What it does
mechanism — not yet written. Published as missing rather than hidden.
Candidate megatrends — unreviewed
- Energy Transition and Electrification
- Distributed and Reshored Manufacturing
- Critical Mineral and Resource Scarcity
- Circular Economy and Materials Substitution