Launch Loop
Readiness
TRL 2 · SRL 3 · gap -1
Gap = technical readiness − societal readiness. Positive: the technology is ready and society is not. Negative: society wants it more than the technology can deliver.
Not scored. Watchlist entries do not enter any gradient.
A proposed structure roughly two thousand kilometres long, holding itself up with the momentum of a continuously circulating cable, from which payloads could be accelerated to orbit without rockets.
Technical readiness 2 — one of the lowest here — and the entry earns its place as a calibration exercise rather than as a forecast. The concept is decades old, the physics has been examined and is not obviously wrong, and nothing resembling a component has been built.
Chapter 8 argues that the binding constraint on orbital compute and space-based solar is launch cost, and it is fair to ask what would happen if that constraint were removed rather than merely reduced. The answer is that several entries in this Compendium would change category. That is a useful thing to know, and it is not a reason to expect it.
Societal readiness sits above technical readiness, which at these levels means very little other than that the idea is more discussed than pursued.
Common misconception: that the loop competes with reusable rockets. Reusable rockets are an incremental cost reduction on a working system. This is a different system that does not exist.
What it does
mechanism — not yet written. Published as missing rather than hidden.
Candidate megatrends — unreviewed
- Time Migration into Digital Environments
- The Built-Environment Deficit
- Platform Mediation of Social Life
- Autonomous Systems and Mobility