Gravity Energy Storage
Readiness
TRL 6 · SRL 5 · gap +1
Gap = technical readiness − societal readiness. Positive: the technology is ready and society is not. Negative: society wants it more than the technology can deliver.
Not scored. Watchlist entries do not enter any gradient.
Surplus electricity lifts a heavy mass; releasing it turns a generator on the way down. Pumped hydro has done exactly this at scale for a century, and these systems substitute stacked composite blocks or a weight in a disused mine shaft for the reservoir and the mountain.
The reason to care is a real gap in the grid. Chapter 8 notes that lithium remains prohibitive for multi-day storage, and the projections do not have it becoming cheap enough. Anything that stores energy for days rather than hours is addressing the part of the problem batteries are not going to solve.
At technical readiness 6 this is beyond demonstration, and the constraint is round-trip efficiency and capital cost per megawatt-hour against pumped hydro, which is mature and cheap where the geography allows. That last clause is the market: places that need long-duration storage and have no mountains.
Common misconception: that it competes with batteries. It competes with pumped hydro, and its case rests entirely on siting flexibility.
What it does
mechanism — not yet written. Published as missing rather than hidden.
Candidate megatrends — unreviewed
- Energy Transition and Electrification
- Distributed and Reshored Manufacturing
- Critical Mineral and Resource Scarcity
- Circular Economy and Materials Substitution