Fusion
Energy from fusing light nuclei — the reaction that powers stars.
Maturity
capability 1 / 5
deployment 0 / 5 ← sets the score
absorption 3 / 5
Bound by capability · trend improving.
Basis, source, vintage
Research stage, and the headline 'gain' figures are routinely misread.
Source: LLNL National Ignition Facility: 5 Dec 2022, 2.05 MJ delivered to target yielded 3.15 MJ (gain 1.5); 7 Apr 2025, 8.6 MJ from 2.08 MJ (gain 4.13). ⚠ Gain measures fusion output against energy DELIVERED TO THE TARGET. LLNL states NIF drew roughly 300–400 MJ from the grid for the ignition shot because the lasers are ~0.5% efficient — the facility energy balance remains massively negative, and there is no continuous operation (2022–2025)
Where you have already met this: In December 2022 the National Ignition Facility delivered 2.05 megajoules to a fuel target and got 3.15 out. It was reported worldwide as net energy gain. The facility drew roughly 300–400 megajoules from the grid for that shot, because the lasers are about 0.5% efficient.
If this moved: Enormously — firm generation with no long-lived waste and no proliferation risk. Which is exactly why the entry needs discipline: the size of the prize is not evidence about the timeline, and the two get substituted for each other constantly in energy planning.
What to watch for: Net electrical output to a grid, not gain against energy delivered to the target. Materials surviving sustained neutron flux. Tritium bred at the rate a plant would consume it. Continuous rather than pulsed operation.
Not to be confused with: Fission, including small modular reactors. Same word in the headline, completely different maturity — fission is deployed in 31 countries and this has never produced net electricity.
What it is
Energy from fusing light nuclei — the reaction that powers stars — pursued through magnetic confinement, inertial confinement and several private approaches.
What it does
If it works at commercial scale it provides firm generation without long-lived waste or proliferation risk. It is separated from fission here because its maturity is entirely different and is routinely conflated.
Common misconception
That recent net-energy milestones mean commercial power is near. Those results measure energy delivered to the fuel, not the energy consumed by the facility, and no design has produced net electrical output.
Steepens
- Critical Mineral and Resource Scarcity — marginal · marginal: not counted in the minimum
- Energy Transition and Electrification — marginal · marginal: not counted in the minimum
What would change its gradient
- Net electrical output, which nothing has achieved
- Materials that survive sustained neutron bombardment
- Tritium breeding at the rate a plant would consume it
Shares megatrends with
- Battery & Storage Chemistry
- Hydrogen
- Materials Science
- Nanotechnology
- Nuclear & SMR
- Renewables & Storage
In the book
Why the Future Arrives Unevenly — Ch. 8 — The Rebuild of the Physical Base · Ch. 14 — How Hype Is Manufactured
Sources
- Research stage, and the headline 'gain' figures are routinely misread. Source: LLNL National Ignition Facility: 5 Dec 2022, 2.05 MJ delivered to target yielded 3.15 MJ (gain 1.5); 7 Apr 2025, 8.6 MJ from 2.08 MJ (gain 4.13). ⚠ Gain measures fusion output against energy DELIVERED TO THE TARGET. LLNL states NIF drew roughly 300–400 MJ from the grid for the ignition shot because the lasers are ~0.5% efficient — the facility energy balance remains massively negative, and there is no continuous operation (2022–2025).