---
id: digital-ecosystems
name: Digital Ecosystems
family: technological
tier: active
url: https://futuremap.talin.digital/e/digital-ecosystems/
license: CC-BY-NC-4.0
---

# Digital Ecosystems

## Maturity
4/5 — Cloud is mature and at scale, and the lock-in thesis is now a regulator finding rather than an assertion.

Source: UK CMA, Cloud Infrastructure Services Market Investigation Final Decision, 31 Jul 2025 (ref 2024): Microsoft and AWS each hold 30–40% of a ~£9bn UK market; egress fees, technical barriers and licensing practices produce lock-in. Ofcom (Oct 2023): the three hyperscalers held 65–80% of the UK market in 2021; ~55% cite egress charges as a major switching barrier. Netherlands Algemene Rekenkamer, 15 Jan 2025: central government uses 1,588 cloud services, more than half from Microsoft, Amazon and Google, with no risk assessment for 84 of 126 material public cloud services (2021–2025)

## What it is
Interlocking sets of services, devices and standards that are more valuable together than separately — and correspondingly harder to leave.

## What it does
It converts a product decision into an infrastructure decision. Choosing one is cheap; changing it later is not, which is why ecosystem choices at national scale deserve the same scrutiny as any other long-lived infrastructure.

## Common misconception
That lock-in is a consumer inconvenience. At institutional scale it is a sovereignty question, and it is usually entered into through procurement decisions nobody framed that way.

## Steepens
- Digital Sovereignty (digital-sovereignty) — large
- Platform Power versus State Power (platform-power-versus-state-power) — large
- Government as a Service (government-as-a-service) — moderate
- The Application Gap (the-application-gap) — moderate

## What would change its gradient
- Data portability implemented as a working export, not as a legal right
- Open standards as a procurement requirement
- Measuring exit cost before entry, which almost nobody does
